POWER TRANSMISSION LINE LENGTH

 

1. Evolution of the power transmission network

 

Voltage Level/Year

2010

2011

2012

2013

2014

2015

2015

Nov-16

Transmission Line of 70kV

87

87

87

87

0

0

0

0

Transmission Line of 110kV

284.4

294.4

294.4

294.4

409.4

422.4

422.4

480.4

Transmission Line 220kV

0

0

0

0

0

93.5

93.5

93.5

Total length in km

371.4

381.4

381.4

381.4

409.4

515.9

515.9

573.9

 

 

 

 

 

 

 

 

 


2. Details on the power transmission projects

 

No

Project Name

Starting Date

Completion date

Impact of the project ( Increase reliability of power supply and grid loss reduction)

1

10km 110kV Karongi – Kibuye transmission line and 110/30/11 kV Kibuye substation

2009

2011

-          The transmission line and substation help in evacuation of power from Kivuwatt power plant.

-          Increase the reliability of the network, especially in the Districts of Karongi, Nyamasheke and Rutsiro.

2

28km 110kV Nyabarongo 1 HPP – Kilinda transmission line and 110/30kV Kilinda substation 

2012

2014

-          The transmission line and substation help in evacuation of power from Nyabarongo 1 hydro power plant.

-          Increase the reliability of the network, especially in the District of Karongi.

3

13km 110kV Gishoma-Bugarama transmission line

2014

April 2016

-          The transmission line and substation help in evacuation of power from Gishoma peat to power plant.

-          Increase the reliability of the network, especially in the District of Rusizi.

4

93.5km 220kV Mirama - Shango Transmission line

December 2013

December 2015

-          This is an interconnection project that will allow the import of power from Uganda, Kenya and Ethiopia in future.

-          Increase of Rwanda network reliability.

5

17.5km 110kV Ntendezi - Bugarama Transmission line and 110/30kV Ntendezi and 110/6.6kV Bugarama substations

 June 2015

September 2016

-          The transmission line and substations help to evacuate the power from Gishoma Peat to power plant while linking the existing network and Gishoma Peat to Power plant and also play the role of network strengthening.

-          Connecting CIMERWA to the nation grid and reduce diesel consumption

-          Increase reliability of power, especially in District of Nyamasheke and Rusizi.

-          Loss reduction.

6

31.5km 110kV Rukarara - Kilinda Transmission line & 110/30kV Rukarara Substation

March 2014

November 2016

-          The transmission line will evacuate the power from Rukarara 1, 2, 5, 6 hydropower plants and other nearby planned power plants and will also ensure also some spinning reserve to reinforce the stability of the Rwandan network.

-          The impact will be seen in the District of Nyamagabe, Nyaruguru, Gisagara, Huye, Nyanza, Ruhango, Muhanaga and Ngororero.

-          Loss reduction.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Remark:

 

A lot of transmission lines and substations are under construction including, among others, 180km 220kV Rwanda – DRC interconnector, 119 km 110kV Rulindo – Gicumbi –Gabiro –Musha Transmission line, 27km 110km Kigali Ring, etc and others are under procurement process including, among others, 64km 220kV Rwanda – Burundi interconnector, 53km 220kV Mamba-Rwabusoro-Bugesera Transmission line, 74km 220kV Kibuye-Kilinda - Kigoma- Rwabusoro transmission line, 29km 110kV Gahanga – Rilima transmission line, etc.

 

 

 

 

 

 