Investment Information Pack

INVESTMENT:

Is a renewed economic activity governed by the renewed ambitions of man, with the changing demands of life and with its unstable conditions due to the availability of information; the world has become one village with resources competitively sought by big, international companies.

These companies seek the best conditions for the investment of their funds especially that the development of stock markets and the increase in their number, along with the diversity of high technology contributed to ensuring a quick turnover.

Rwanda government realized the need for investment now that the country has great potentialities, and its unexploded resources prevail its wide area. These resources included big and small projects.

Rwanda is a land of secured atmosphere conditions by its tropical locations. Rwanda also realized necessity of providing and investment atmosphere with the most stable conditions and political security to attract investors who are no longer barred by barriers of time and space.

DOMESTIC ENERGY INVESTMENT OPPORTUNITIES.

Mini-grid Investment opportunities

Name of the Project

Generation of Energy by resource

Location

Where the national grid will not reach in 5 and above years to come around the country.

Capacity

20 sites to be assessed and to determine the best within <=1MW

Project description

Capacity

Present situation

First phase started by tendering process

Implementation period

To be determined

Objectives

-          Introduction of new and renewable energy systems

-          Achieving 70% access to electricity by 2018

-          Electrifying households far from the national network

-          Boosting the economy of rural areas with the use of electricity

Contact details

REG/RDB

 

 

 

 

 

 

 

 

 

 

 

 

 

Hydropower Investment opportunities/Green and Brown fields

Name of the Project

Generation of energy from small hydropower potentials around the country

Location

Determined by the specific study of the site.

Capacity

Identified in the feasibility study of the site

Project description

9 brown field sites, 32 Green field sites to be tendered by phases into lots. Amongst 32, 16 sites to be tendered soonest.

Present situation

Process in place and to continued.

Implementation period

To be determined by the winning bidder

Objectives

-          Introduction of new and renewable energy systems

-          Achieving 70% access to electricity by 2018

-          Increase of the national network

-          Maintaining the stability of the electric current

-          Meeting the government’s energy strategic plan

Contact details

REG/RDB

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Hydropower Investment Opportunities/Green fields without FS

Name of the Project

48 Hydropower green field sites without feasibility studies

Location

Scattered around the country in all regions

Capacity

-          Estimated capacity available in the Annex II.

-          Actual values to be determined in the feasibility studies.

Project description

Capacity

Present situation

Sites’ identification completed

Implementation period

To be determined in the feasibility studies

Objectives

-          Introduction of new and renewable energy systems

-          Achieving 70% access to electricity by 2018

-          Electrifying households far from the national network

-          Boosting the economy of rural areas with the use of electricity

Contact details

REG/RDB

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Methane gas opportunity

Name of the project

Methane gas

Location

Lake Kivu

Capacity

To be determined based on tender

Project description

Methane in lake Kivu is estimated to be sufficient to generate 700MW of electricity over a period of 55 years.

Project situation

-          5MW and 25MW pilot projects under construction by local companies

-          Extra 100MW was estimated and to be generated in future

-          A 25MW tender to be launched as IPP by the end of March 2015.

Implementation period

To be determined based on tender

Objectives

-          Enhancing power security and network stability in the country

-          Meeting the interconnection technical conditions in the region.

-          Meeting the increasing demand on energy in the industrial and economic growth.

 

Contact details

REG/RDB

Peat to power opportunity

Name of the project

Peat to power

Location

Country wide

Capacity

To be determined

Project description

Tender to Generate electric power from peat as an IPP

Project situation

-          Peat resource survey is ongoing to determine peat capacity

-          Deadline is march 2015

Implementation period

To be determined based on tender and the peat resource

Objectives

-          Diversification of energy resources

-          Enhancing installed power capacity in the country

Contact details

REG/RDB

DOMESTIC TRANSMISSION LINES

Medium transmission lines

Name of the project

Pre-financing of medium and low voltage lines construction around the country

Location

countrywide

Capacity

Medium and low voltage lines/Annex III

Project description

The project is included in the regional plan for the expansion of the required country’s network.

Present situation

Planning and Sites’ identification completed

Implementation period

1 year with effect from the date of notification of e winning bidder

Objectives

-          Meeting the increasing demand on energy in the industrial and economic growth.

-          Meeting the interconnection technical conditions in the region.

Contact details

REG/RDB

WATER SUPPLY PROJECT

Name of the project: “PPP Mutobo Bulk Water Supply Project”

Location

From northern (Musanze) to Kigali capital

Capacity

To be determined in the feasibility study

Project description

The project included studies and financing with expropriation and replacement

Present situation

Source of water potential identified

Implementation period

To be determined based on tender process

Objectives

-          Meeting the increasing demand on water in the industrial and community growth.

 

Contact details

RED/RDB

Annex I: Information on 9 HPPS for IPP Tender.

No.

POWER PLANT NAME

INSTALLED CAPACITY IN KW

Energy produced  (KWh) from COD

Observations.

1

Nkora

680  

5,457,606

 

2

Cyimbiri

300 

1,637,287

 

3

Keya

2,200 

6,627,780

 

4

Gihira

1,800 

27,236,804

Figures after rehabilitation (2011)

5

Gisenyi

1,200 

12,178,617

Figures after rehabilitation in 2011

6

Rugezi

2,500 

7,238,281

 

7

Rukarara II

2,200 

2,417,756

 

8

Nyamyotsi I

100 

34,865

 

9

Nyamyotsi II

100 

51,576

 

 

ANNEX II: Sites with Feasibility Studies

NO.

SITE NAME

CAPACITY (kW)

LOCATION

1

Nyirabanda

223

Western/Nyamasheke

2

Mbirumbe C

87

Western/Karongi

3

Biruyi B

81

Western/Nyamasheke

4

Mukebero A

54

Western/Rutsiro

5

Nyabugonde

50

Western/Nyamasheke

6

Rubyiro

65

Western/Rusizi-Nyamasheke

7

Kiruli

50

Western/Rutsiro

8

Mukebero B

25

Western/Rutsiro

9

Gasesa

24

Western/Ngororero

10

Magarama

53

Wetsern/Karongi

11

Gisuma

11

Western/Karongi

12

Buhali

111

Western/Karongi

13

Kibilira

42

Western/Ngororero

14

Rungu

22

Western/Ngororero

13

Matyazo

32

Western/Nyamasheke

14

Ntondwe

81

Western/Nyamasheke

 

SITES WITH FS  TO BE TENDERED OUT IN SEPTEMBER 2014

1

Musogoro

260

Western/Karongi

2

Mbirurume B

225

Western/Karongi

3

Karumbi

127

Western/Karongi

4

Nyabeshaza

269

Northern/ Musanze

5

Satinsyi

343

Western/Ngororero

6

Secoko

207

Western/Ngororero

7

Rungu

227

Western/Ngororero

8

Cyintiti+ Rukubi

244

Western/Ngororero

9

Kigoya

177

Western/ Nyamasheke

10

Nyirakesha

208

Western/ Nyamasheke

11

Nyarubandwei,Ii& Iii

251

Western/Rutsiro

12

Biruyi

158

Western/ Nyamasheke

13

Mukondo

252

Western/ Nyamasheke

 

                              SITES WITHOUT FEASIBILITY STUDIES

NO.

SITE NAME

CAPACITY (kW)

LOCATION

1

Rwerere A

250

Southern/Nyaruguru

2

Ruramba

650

Southern/Nyamagabe

 

3

Kuwanyarure

250

Southern/Nyaruguru

4

Mugambazi

250 

Northern/Gakenke

5

Nyamuruta

1,200

Southern/ Nyaruguru

 

6

Karuruma

100

Northern/Burera

7

Simbuka I

100

Southern/Nyaruguru

8

Akavuguto

100

Southern/Nyaruguru

9

Gifuracyamigina

100

Southern/Nyaruguru

10

Mugambazi Ii

100

Northern/Gicumbi

11

Mugambazi Iii

100

Northern/Gicumbi

12

Mugambazi Iv

100

Northern/Gicumbi

13

Mugambazi V

100

Northern/Gicumbi

14

Rwerere C

100

Southern/Nyaruguru

15

Mugambazii

250

Northern/Gakenke

16

Kabaya

1,046

West/ Rusizi/Gitambi

17

Njambwe2

1,303

West/ Rusizi/Gitambi

18

Katabavu1

359

West/Rusizi/Rwimbogo+Gitambi

19

Katabavu2

175

West/Rusizi, Gashonga + Rwimbogo For Intake And Gitambi For Power House

20

Njambwe

663

West/ Rusizi/ Njambwe-Gitambi

21

Ryakanyambo

639

West/ Rusizi/ Gashonga-Rwimbogo

22

Bushekeri

660

West/Nyamasheke/ Bushekeri

23

Bigeyo

1,289

West/Nyamasheke/Cyato

24

Musogoro

1,293

West/Karongi/Rubengera

25

Kinyami

495

West/Karongi/Gitesi

26

Kagano

1,522

West/Rutsiro/Mukura

27

Gatare2

1.037

West/Rutsiro/ Nyirabirasi

28

Gihango

1,130

West/Rutsiro/ Gihango

29

Koko

250

West/Rutsiro/ Ruhango

30

Kamuramira

373

West/Rutsiro/Murunda

31

Rugeyo

2,137

West/Rutsiro/Murunda

32

Gatare

1,271

West/Rutsiro/Nyirabirasi

33

Muhura Iii

125

South/Nyamagabe/Gatare-Nkomane

34

Range

432

South/Nyamagabe/Nkomane

35

Rurongora

287

South/Nyamagabe/Mushubi

36

Rwondo 2

537

South/Nyamagabe/Mushubi

37

Masango

105

South/Ruhango/Kabagali

38

Gasharu

395

West/Karongi/Mutuntu

39

Uwintobo

250

West/Karongi/Twumba

40

Gihinga

500

North/Gakenke/Gakemke-Karambo

41

Kavumu

279

West/Ngororero/Kavumu

42

Ntaruko

139

West/Ngororero/Kabaya

43

Rucanzogera

847

West/Ngororero/Bwira

44

Mugambazi

1,000

West/Ngororero/Mataba

45

Kabaya

217

West/Nyabihu/Muringa

46

Ruhanga

178

West/Nyabihu/Muringa

47

Mwogo C

194

South/Huye/Maraba

48

Macu

272

South/Nyamagabe/Kitabi

TOTAL ESTIMATED CAPACITY IS 29.3 MW

1.      1. TRANSMISSION LINES AND SUBSTATIONS (Domestics)

 

 

Project Description

Feasibility Study Status

Implementation

Planned / Ongoing

Project Cost

(USD)

COD

Remarks

I

Domestic Transmission lines

 

 

 

 

1

 

Construction of 220kV Transmission line Bwishyura-Karongi-Kilinda-Kigoma-Rwabusoro-Rilima (116.6km)

Feasibility studies under progress  with the final output expected in Oct, 2014

Consultant: Parsons Brinckerhoff Africa (PBA)Parson

Implementation planned for 2014 -2016

27,984,000

2016

Power evacuation from the proposed KivuWatt Methane gas Power Plant (Bwishyura) to the grid and major load centers also will be used for export.

Power evacuation from the proposed peat power plant at Rwabusoro onto the grid and to major load centers.

2

Construction of 220kV Transmission line Mamba – Huye (23km)

Feasibility studies under progress  with the final output expected in Oct, 2014

Consultant: Parsons Brinckerhoff Africa (PBA)Parson

Implementation planned for 2014 -2016

5,520,000

2016

Evacuation of 80MW from the proposed peat power plant at Mamba into the grid

3

Construction of 220kV Transmission line Mamba –Rwabusororo (19km)

Feasibility studies under progress  with the final output expected in Oct, 2014

Consultant: Parsons Brinckerhoff Africa (PBA)Parson

Implementation planned for 2014 -2016

4,560,000

2016

Evacuation of 80MW from the proposed peat power plant at Mamba into the grid

4

Construction of 220kV Transmission line Kalisimbi – Rubavu Sub Station (29.3km)

Feasibility studies under progress  with the final output expected in Nov, 2014

Consultant: Artelia

Implementation planned for 2016 -2018

7,032,000

2018

Power evacuation from the proposed Kalisimbi Geothermal Power plant to the grid.

5

Construction of 220kV Transmission line Shango – Rilima (Bugesera)  Sub Station (53km)

No feasibility Study

Implementation planned for 2015 -2016

12,720,000

2016

Supply the incoming Bugesera airport, Bugesera Industrial zone and reinforce the distribution network in the area

 

6

Construction of 110kV Transmission line Kalisimbi – Mukungwa (39.1km)

Feasibility studies under progress  with the final output expected in Nov, 2014

Consultant: Artelia

Implementation planned for 2016 -2018

6,256,000

2018

Power evacuation from the proposed Kalisimbi Geothermal Power plant to the grid and Musanze Network.

7

Construction of 110kV Transmission line (113km) Musha – Gabiro – Rulindo

-  Feasibility studies complete

-  EPC contractor under procurement process

Implementation planned for 2014-2015

21,800,000

2016

- Evacuation of Energy produced in the Northern Network.

- Evacuation of Energy Produced by all power plant installed in the North

- Allow N-1 criteria of line Rulindo – Jabana -Gikondo

8

Construction of 110kV Transmission line (19km) Nyabarongo II HPP- new Rulindo

-  Feasibility studies complete

-  EPC contractor under procurement process

Implementation planned for 2014-2015

3,500,000

2016

Evacuate power from Nyabarongo II HPP

9

Construction of 110kV HV line Bugarama –Ntendezi (23km)

-  -Feasibility studies complete

-  -EPC contractor under procurement process

Implementation planned for 2014-2015

2,800,000

2015

Bugarama - Ntendezi line will help to supply CIMERWA new 15MW big factory at Mashyuza.

 

Existing infrastructure at Mashuza Substation is not capable of supplying the required 15MW at 30kV.

10

Construction of 110 kV line Mont Kigali – Gahanga (7.9km)

No Feasibility Study

Implementation planned for 2015-2016

1,264,000

2016

Kigali City Network reinforcement projects (Kigali ring)

11

Construction of 110 kV line Gahanga – Ndera (15.1km)

No Feasibility Study

Implementation planned for 2015-2016

2,416,000

2016

Kigali City Network reinforcement projects (Kigali ring)

12

Construction of 110 kV line Ndera – Gasogi (6.52km)

No Feasibility Study

Implementation planned for 2015-2016

1,043,200

2016

Kigali City Network reinforcement projects (Kigali ring)

13

Construction of 110 kV line Jabana– Mont Kigali (13.7km)

No Feasibility Study

Implementation planned for 2015-2016

2,192,000

2016

Kigali City Network reinforcement projects (Kigali ring)

14

Construction of 30kV transmission line Rulindo-Byumba-Gatuna (41km) and 30kV transmission line Byumba–Ngarama (22km)

-  Feasibility studies complete

-  EPC contractor under procurement process

Implementation planned for 2014-2015

7,000,000

2015

New MV transmission line construction in replacement of the existing 30 kV sub-standard Rulindo-Gatuna line with no earth wire.

 

15

Construction of 110 kV line Mukungwa - Nyabihu (23.3km)

No Feasibility Study

Implementation planned for 2015-2016

3,728,000

2016

Nyabihu industrial area reinforcement projects

16

Construction of 110 kV line Rukarara – Huye –Butare (41.8km)

No Feasibility Study

Implementation planned for 2015-2016

6,688,000

2016

Huye area reinforcement project and contingency purposes

 

S/Total Domestic Transmission lines

 

 

116,503,200

 

 

 

 

 

Project Description

Feasibility Study Status

Implementation

Planned / Ongoing

Project Cost

(USD)

COD

Remarks

II

Domestic Substations

 

 

 

 

 

1

Construction of 220/110/30kV Rilima (Bugesera) Substation

Feasibility studies under progress  with the final output expected in Oct, 2014

Consultant: Parsons Brinckerhoff Africa (PBA)Parson

Implementation planned for 2015-2016

10,664,000

2016

Supply the incoming Bugesera airport, Bugesera Industrial zone and reinforce the distribution network in the area

Efficient supply to the 110kV network to distribute power to all load centers.

2

Construction of new 110/30kV Gabiro Substation

-  Feasibility studies complete

-  EPC contractor under procurement process

Implementation planned for 2014-2015

7,500,000

2016

- Gabiro substation will allow reducing the voltage drop in the 30kV distribution network.

- To supply the Eastern region in case, Kabarondo substation is under maintenance or repair

3

Construction of new 110/30kV Rulindo Substation

-  Feasibility studies complete

-  EPC contractor under procurement process

Implementation planned for 2014-2015

6,500,000

2016

- The existing Gabiro substation is not capable of receiving energy from the Nyabarongo II planned HPP.

- Re-location and need of construction of new substation for environmental purpose

4

Construction of 110/30kV Ntendezi Substation

-  -Feasibility studies complete

-  -EPC contractor under procurement process

Implementation planned for 2014-2015

6,700,000

2015

Bugarama Ntendenzi project will help to supply CIMERWA new 15MW big factory at Mashyuza.

Ntendezi Substation will strengthen the MV network in the area.

5

Extension of BUGARAMA Substation

-  -Feasibility studies complete

-  -EPC contractor under procurement process

Implementation planned for 2014-2015

8,560,000

2015

Bugarama Ntendenzi project will help to supply CIMERWA new 15MW big factory at Mashyuza.

 

Existing infrastructure at Mashuza Substation is not capable of supplying the required 15MW at 30kV.

6

Rehabilitation of 110/30kV Gifurwe Substation

Feasibility studies under progress  with the final output expected in Nov, 2014

Consultant: Artelia

Implementation planned for 2015-2016

6,500,000

2016

The MV lengths in the area are very long creating voltage drop.

Need to strengthen the MV network

7

Construction of 110kV Ndera Substation

No Feasibility Study

Implementation planned for 2015-2016

8,500,000

2016

A substation at Ndera will provide good supply to the Kigali SEZ

8

Construction of 110kV Gahanga Substation

No Feasibility Study

Implementation planned for 2015-2016

5,600,000

2016

A substation at Gahanga will provide supply for the proposed sport stadium.  There is existing industrial load close to that position which is now being supplied from Gikondo.  Planned Water pumping schemes along the Nyabarongo River will be within short reach of Gahanga substation

9

Construction of 110kV Muhima Substation

No Feasibility Study

Implementation planned for 2015-2016

7,900,000

2016

The ideal position for a new substation will be as close as possible to the City Centre. A substation strategically placed at Muhima can take load from all three the Kigali North, Kigali South and the KBC feeder.

10

Construction of Nyabihu Substation

No feasibility Study

Implementation planned for 2015-2016

5,137,000

2016

Supply of the Nyabihu industrial area

12

Construction of 110/30kV Huye Substation

No feasibility Study

Implementation planned for 2015-2016

5,813,800

2016

The 110kV line from Rukarara to Butare will connect to the proposed Huye substation for contingency purpose

 

S/Total Domestic Substation

 

 

79,374,800

 

 

 

 

 

 

 

 

 

 

Total Domestic Projects (Transmission lines and Substations)

 

195,878,000

 

 

1.      1.400kV Interconnection Standardization for Kenya – Uganda and Rwanda

 

Project Description

Feasibility Study Status

Implementation

Planned / Ongoing

Project Cost

(USD)

COD

Remarks

I

400kV Interconnection Standardization

 

 

 

 

1

400kV transmission line and Birembo Substation

Feasibility studies procurement under progress.

 

Implementation planned for 2015-2018 (Rwanda part; from Mirama-Uganda to Birembo Substation).

 

2,000,000 (F.S)

 

370,000,000

(Implementation)

2018

The timelines for the 400kV interconnection grid Standardization were reviewed as follows;

•           The process to start with the procurement of consultant: 4 months i.e. (August-November, 2014).

•           Network analysis and feasibility study to start after procuring the FS contractor: 3 months i.e. Dec to Feb, 2015.

•           Environmental, Social Impact Assessment and Acquisition of way leave to be conducted between March 2015 and Dec. 2015.

•           Procurement of the EPC contractor:  6 months i.e. April, 2015 to October, 2015

•           Construction was given 32 Months i.e. November 2015 –June, 2018;

• Commissioning to be done in July, 2018.

 

  1. Construction of a 3,059km Medium Voltage and a 4,936km low voltage Electrification Projects and connection of 231,762 households.
  2. Construction of Rulindo and Gifurwe substations tender to be tendered soon.

The projects will include Fill-in connections and Re-location of people to planned settlements.


 Investment Information Pack in pdf


 